Home  > In Practice  > Costco Distribution Centre

Costco Distribution Centre

Client: Costco Wholesale UK

Location: Crick, Northamptonshire

Industrial

Envision were appointed by Costco as the specialist refrigeration engineer for their new distribution centre at Crick Northamptonshire.  The state of the art facility was designed by Envision to provide cold storage to an area of approximately 10,000 m2. The chill store being held at a constant 4oC.  The design also includes a circa 800m2 low temperature freezer operating at -24oC.  The system was designed to be capable of extension, to enable a future phase of development.

Envision designed a pumped NH3 (Ammonia) refrigeration system to ensure effective refrigeration using a natural refrigerant designed to minimise energy consumption for the year-round operation of the distribution centre.  Phase 1 of the distribution centre was handed over for operation in October 2015.

Latest Projects

71 Kingsway London

The building comprises of a 5 storey office block situated on Kingsway, on the corner of Wild…

View case study

20 Fenchurch Street (The Walkie-Talkie)

20 Fenchurch Street is one of London’s most emblematic skyscrapers. Commonly known as The Walkie-Talkie, the commercial…

View case study